Deprecated: Methods with the same name as their class will not be constructors in a future version of PHP; jwl_metabox_admin has a deprecated constructor in /home/aquaoper/public_html/wp-content/plugins/ultimate-tinymce/main.php on line 212

Deprecated: Methods with the same name as their class will not be constructors in a future version of PHP; jwl_PHP_Code_Widget has a deprecated constructor in /home/aquaoper/public_html/wp-content/plugins/ultimate-tinymce/options_functions.php on line 801

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the genesis domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/aquaoper/public_html/wp-includes/functions.php on line 6114
Plant Startup – Fresno-Clovis Regional Reclamation Facility

Plant Startup – Fresno-Clovis Regional Reclamation Facility

facilityAqua Operations is working with W.M. Lyles Co. on the startup of the City of Fresno-Clovis Regional Tertiary Treatment and Disinfection Facility designed by Parsons Engineering. Mike Popichak is the startup coordinator of the MBR facility featuring UV disinfection designed to take the primary effluent of the existing secondary treatment facility receiving approximately 70 million gallons per day collected through more than 1,500 miles of sewer.

This is the second time teaming up for plant startup of a IMG_3494Parsons design and W.M. Lyles construction with Aqua Operations. Mike Popichak, a principal partner of Aqua Operations, will act as coordinator of this project in the San Joaquin Valley of California. Previously, this same team designed, built and commissioned the  City of Tulare Industrial Wastewater Treatment Facility  featuring 6 sequencing batch reactors (SBRs) with a designed flow of 12 million gallons per day.